
Colour
Colour matching is confirmed against an approved physical reference. Material and colour requirements are reviewed together.
No tooling change · existing moulds
OEM & ODM
Existing models support colour, printing and packing customisation. New designs are developed from your drawings or samples, with tooling scope, lead time and commercial terms agreed for the project.
Indicative lead times
Design — about 3 days from brief to proposal
Sample — about 7 days for preparation from existing tooling
Bulk lead time — 15–25 days after approval
Private mould — development schedule and terms quoted per project
Customisation options
Available options depend on the selected product. Colour and printing may use existing tooling; changes to geometry, assembly or material require technical review.

Colour matching is confirmed against an approved physical reference. Material and colour requirements are reviewed together.
No tooling change · existing moulds

Single- or multi-colour top printing to your artwork, with a proof before the run.
No tooling change · artwork proof first

Carry handles for water containers, with low-profile and ribbed-grip designs. Neck engagement and load requirements require confirmation.
Existing tooling in 45 mm and 55 mm

Non-spill closure options for water dispenser bottles. The bottle finish and dispenser interface must be checked together.
Model and assembly requirements on enquiry

Clear, tinted and opaque decorative over-caps. Installation dimensions are checked against the bottle and functional closure.
52, 56 and 60 mm models · installation fit to confirm

Development from your drawing, 3D file or physical sample. Tooling requirements and project terms are agreed before manufacture.
New mould required · quoted per project
Development timeline
Provide the bottle drawing or sample, contents, filling conditions, required quantity and destination market.
We assess available models and identify any new tooling requirements. Cost and lead time are quoted before development begins.
A proposed design and material specification for review, with the required fit and application evaluations identified.
Samples from existing tooling are prepared for evaluation. New tooling, sample charges and transit time are confirmed separately.
The design, material, colour, printing and applicable fit and performance requirements are approved before bulk production.
Production follows the agreed specification, inspection plan and packing requirements. Shipment terms and documents are confirmed with the order.

Private moulds
Tooling specifications and commercial terms are confirmed before development. The review covers design requirements, production conditions, ownership and approval procedures.
Exclusive tooling is available by agreement. Ownership, permitted use, storage and maintenance are defined in the project terms.
Mould cost and development time are quoted per project. Cavity count, material, production volume and component design inform the tooling proposal.
Provide the capper type, line speed and filling conditions. Compatibility is evaluated with the bottle and closure assembly under the intended operating conditions.
Drawing revisions and approval samples define the production specification. Changes are reviewed before the next production run.
Required project information
Preliminary information is sufficient for an initial review. Final drawings, samples and operating requirements are confirmed before production approval.
Neck-finish dimensions, thread or snap-fit geometry, tolerances and bottle material. Provide a drawing or physical sample where available.
Food or beverage type, filling temperature, pressure where applicable, storage conditions and intended shelf life.
Quantity per order, estimated annual demand and destination market for quotation and documentation review.
Logo files in vector format if you want printing, plus any Pantone references you are matching to.
Development brief
Provide the available bottle drawings, sample information and application requirements. Our team will confirm the information needed for a development quotation.