OEM & ODM

Product customisation and mould development

Existing models support colour, printing and packing customisation. New designs are developed from your drawings or samples, with tooling scope, lead time and commercial terms agreed for the project.

Indicative lead times

Design — about 3 days from brief to proposal

Sample — about 7 days for preparation from existing tooling

Bulk lead time — 15–25 days after approval

Private mould — development schedule and terms quoted per project

Customisation options

Materials, appearance and component design

Available options depend on the selected product. Colour and printing may use existing tooling; changes to geometry, assembly or material require technical review.

Bottle caps moulded in blue, red, green and white

Colour

Colour matching is confirmed against an approved physical reference. Material and colour requirements are reviewed together.

No tooling change · existing moulds

Bottle caps with multi-colour printing on the top face

Printing

Single- or multi-colour top printing to your artwork, with a proof before the run.

No tooling change · artwork proof first

Red and white plastic carry handles for barrelled water necks

Carry handle

Carry handles for water containers, with low-profile and ribbed-grip designs. Neck engagement and load requirements require confirmation.

Existing tooling in 45 mm and 55 mm

Blue non-spill cap shown open and closed

Non-spill insert

Non-spill closure options for water dispenser bottles. The bottle finish and dispenser interface must be checked together.

Model and assembly requirements on enquiry

Clear and tinted decorative over-caps for mineral water bottles

Decorative over-cap

Clear, tinted and opaque decorative over-caps. Installation dimensions are checked against the bottle and functional closure.

52, 56 and 60 mm models · installation fit to confirm

PET preform alongside the blown bottle and its closure

New shape

Development from your drawing, 3D file or physical sample. Tooling requirements and project terms are agreed before manufacture.

New mould required · quoted per project

Development timeline

Development and production stages

  1. Brief

    Provide the bottle drawing or sample, contents, filling conditions, required quantity and destination market.

    Initial review
  2. Model & tooling assessment

    We assess available models and identify any new tooling requirements. Cost and lead time are quoted before development begins.

    Project-specific
  3. Design proposal

    A proposed design and material specification for review, with the required fit and application evaluations identified.

    About 3 days
  4. Physical sample

    Samples from existing tooling are prepared for evaluation. New tooling, sample charges and transit time are confirmed separately.

    About 7 days
  5. Approval

    The design, material, colour, printing and applicable fit and performance requirements are approved before bulk production.

    Your schedule
  6. Production & shipment

    Production follows the agreed specification, inspection plan and packing requirements. Shipment terms and documents are confirmed with the order.

    15–25 days
Digital caliper measuring the neck diameter of a moulded closure
Dimensional review supports bottle and closure compatibility assessment.

Private moulds

Custom tooling requirements

Tooling specifications and commercial terms are confirmed before development. The review covers design requirements, production conditions, ownership and approval procedures.

  1. Tool ownership & exclusive use

    Exclusive tooling is available by agreement. Ownership, permitted use, storage and maintenance are defined in the project terms.

  2. Tooling scope & quotation

    Mould cost and development time are quoted per project. Cavity count, material, production volume and component design inform the tooling proposal.

  3. Bottle & production-line compatibility

    Provide the capper type, line speed and filling conditions. Compatibility is evaluated with the bottle and closure assembly under the intended operating conditions.

  4. Design revisions & approval

    Drawing revisions and approval samples define the production specification. Changes are reviewed before the next production run.

Required project information

Information for technical review

Preliminary information is sufficient for an initial review. Final drawings, samples and operating requirements are confirmed before production approval.

  1. 01

    Bottle specification

    Neck-finish dimensions, thread or snap-fit geometry, tolerances and bottle material. Provide a drawing or physical sample where available.

  2. 02

    Contents & filling conditions

    Food or beverage type, filling temperature, pressure where applicable, storage conditions and intended shelf life.

  3. 03

    Volume and market

    Quantity per order, estimated annual demand and destination market for quotation and documentation review.

  4. 04

    Artwork

    Logo files in vector format if you want printing, plus any Pantone references you are matching to.

Development brief

Submit a development enquiry

Provide the available bottle drawings, sample information and application requirements. Our team will confirm the information needed for a development quotation.

Design
About 3 days
Sample
About 7 days
Bulk
15–25 days after approval

Send an inquiry

Submit an enquiry

Provide your product requirements and contact details. We aim to respond within one business day, Monday to Saturday.

Add WhatsApp (optional)
Used only to respond to this inquiry · Privacy PolicyNo account or verification step

Direct contact

Contact our sales team

Email and WhatsApp are available for product enquiries, sample requests and quotation follow-up.

We aim to respond within one business day, Monday to Saturday. See our Privacy Policy.

WhatsAppEmail